Posts Tagged ‘Mick Fowler’

Keep-fit for mountaineering

Historically I have to admit to being notoriously slow at walking. Many a climbing partner has asked if there is something wrong as I have staggered my way towards the [...]

(0) Comments

+ Read more

Categorised under:
Athlete Blogs and News, Mick Fowler

Mick Fowler – Kishtwar Kailash

When a trip is only a one month long 8 days is a long time to get to base camp. But some peaks are so urge giving that minor problems like [...]

(0) Comments

+ Read more

Categorised under:
Athlete Blogs and News, Mick Fowler

Keeping trim between trips!

Keeping the body in trim for the annual Himalayan trip takes some uncharted directions on occasion. Last week it was cycling. There I was sticking to my tried and tested [...]

(1) Comment

+ Read more

Categorised under:
Athlete Blogs and News, Mick Fowler

Mick Fowler and Paul Ramsden awarded second Piolet d’Or!

Alpine Club President Mick Fowler and his regular climbing partner Paul Ramsden were, last weekend, awarded Piolets d’Or for their ascent of the Prow of Shiva in India.
The two climbers [...]

(0) Comments

+ Read more

Categorised under:
Athlete Blogs and News, Mick Fowler

Mick Fowler and Paul Ramsden nominated for the 2013 Piolet d’Or

Berghaus athlete Mick Fowler, along with climbing partner Paul Ramsden, has been shortlisted for the 2013 Piolet d’Or Award.  Fowler and Ramsden have been nominated for their success in achieving [...]

(0) Comments

+ Read more

Categorised under:
Athlete Blogs and News, Mick Fowler

Archive

  • 2014
  • 2013
  • 2012
  • 2011
  • 2010
  • 2009

Newsletter

Sign-up and be the first to know all the latest Berghaus news.

Latest News

Latest Tweets

Connect

Features

Double success for Berghaus in the 2014 ISPO Awards

Berghaus has won two major international industry awards for products developed by its MtnHaus® design and development team.  In the 2014 ISPO Awards, a jury of experts from around Europe [...]

+ Read More

Desktop Calendar January 2014

Below are our desktop calendars for January. To download simply click on the thumbnail of the version and size you need and the full size image will open in a [...]

+ Read More

Ulvetanna Success

Location: Mavericks, Ulvetanna Base Camp, S 71 49.146′, E 008 21.867′
Temperature: -15 C, clear, sunny and beautiful, 0 knots.
NE Ridge Ulvetanna, 1750m, E6 6b, 5.12, A2 (C2)
We made it! [...]

+ Read More